{"schema_version":"1.0","generated_at":"2026-09-04","barramento":{"codigo":"PE_BOM_NOME_230KV","nome":"BOM NOME","estado_uf":"PE","tensao_kv":230.0,"lat":-7.9974,"lon":-38.6275},"identity":{"operators":null,"is_apolo_top30":false,"apolo_rank":null,"cluster_letter":null,"score_preliminar":null,"host_type":"gerador","host_total_mw":862.5,"host_dominant_fonte":"UFV","compound_voltages_kv":null},"tariff_signals":{"beta_multiplier":0.9,"beta_status":"eligible","beta_fonte":"PORTARIA_MME_DEFINITIVA_2026","tusdg_brl_per_mwh":17.0,"tustg_brl_per_mwh":12.7671},"curtailment":{"pct_p12m":71.9,"plant_count":3,"total_gwh_p12m":33.87,"margin_warning_high":true},"connection":{"scenario":"shared_renewable"},"host_distress":{"max_score":null,"parent_groups":null,"generator_count":0,"signal_present":false,"parent_group_confidences":null},"capex":{"mw":150.0,"hours":4.0,"connection_scenario":"shared_renewable","bess_per_mw":3600000.0,"bess_total":540000000.0,"bop_total":85050000.0,"conn_low":3000000.0,"conn_base":5500000.0,"conn_high":8000000.0,"total_brl":630550000.0,"all_in_brl_per_mw":4203666.666666667,"all_in_brl_per_kwh_ac":1050.92},"pdisp":{"mw":150.0,"capex_per_mw":4203667.0,"contract_years":15,"useful_life_years":20,"bid_margin_pct":0.15,"funding_mix":{"equity_pct":0.3,"debt_bndes_pct":0.4,"debt_debenture_pct":0.3,"blended_debt_rate_real":0.0707},"rates":{"target_irr_equity_real":0.142,"rate_debt_bndes_real":0.06,"rate_debt_debenture_real":0.085,"corporate_tax_rate":0.34},"breakdown_per_mw_yr":{"operating_om_seguro_ga":147000.0,"operating_augmentation_avg":93000.0,"operating_tust":113000.0,"operating_encargos_setoriais":20000.0,"operating_total":373000.0,"debt_service":324537.0,"equity_pretax_dividend":277390.0,"tax_shield_depreciation":71462.0},"pdisp_total_per_mw_yr":974927.0,"pdisp_total_project_brl":146239104.0,"pdisp_cost_recovery_per_mw_yr":974927.0,"bid_margin_brl_per_mw_yr":146239.0,"pdisp_recommended_per_mw_yr":1121166.0,"pdisp_recommended_project_brl":168174970.0,"note":"Modelo Phase 8.e calibrado ao dossier BJL. Cost-recovery 15y CRCAP; depreciation × 34% IRPJ+CSLL shield. Bid margin 15% on top (execution risk + cushion)."},"sensitivity":{"baseline_pdisp_brl_per_mw_yr":974927.0,"beta_multiplier":0.9,"sensitivities":[{"variable":"tarifa_dupla_vs_simples","unit_change":"+TUST na carga","delta_brl_per_mw_yr":220000,"delta_pct":22.6,"category":"info","rationale":"ANEEL aprovou em voto 02/06/2026 tarifa simples p/ SAE despachado pelo ONS; dupla só p/ SAE autônomo; REN aguarda DOU"},{"variable":"se_greenfield_vs_existing","unit_change":"+R$ 41M","delta_brl_per_mw_yr":195000,"delta_pct":20.0,"category":"destroyer","rationale":"SE greenfield ao invés de SE existente"},{"variable":"beta_perdido","unit_change":"0.90 → 1.00","delta_brl_per_mw_yr":97492,"delta_pct":10.0,"category":"destroyer","rationale":"Perda de 10% bonificação classificatória se β reverter a 1.0"},{"variable":"capex_plus_10pct","unit_change":"+10%","delta_brl_per_mw_yr":97492,"delta_pct":10.0,"category":"warning","rationale":"Cotação OEM 10% acima do baseline"},{"variable":"wacc_plus_100bps","unit_change":"+1 pp","delta_brl_per_mw_yr":88000,"delta_pct":9.0,"category":"warning","rationale":"Target IRR equity real +1pp"}]},"scorecard":[{"label":"β / MISCR","score":10,"tier":"red"},{"label":"Conexão","score":60,"tier":"blue"},{"label":"Margem operacional","score":50,"tier":"blue"},{"label":"TUST-G","score":36,"tier":"amber"},{"label":"Compound multi-V","score":40,"tier":"amber"},{"label":"Score APOLO","score":0,"tier":"red"}],"tese_factors":["curtailment de 71.9% — sinal forte de P30 MISCR EPE; β = 0.90","hub de geração próximo (862 MW UFV agregado)"],"risks":[{"severity":"Crítico","category":"Margem de escoamento real","description":"Curtailment de 71.9% indica congestão — NT EPE-086 alerta que MISCR não internaliza margem de escoamento.","mitigation":"Solicitar análise de margem via NT-ONS DPL específica antes de comprometer CAPEX."},{"severity":"Médio","category":"Tarifa dupla TUST/TUSD","description":"ANEEL aprovou em voto 02/06/2026 tarifa simples p/ SAE despachado pelo ONS (caso LRCAP); dupla só p/ SAE autônomo. REN aguarda publicação no DOU. Risco residual: perder a condição de despachado pelo ONS (Pdisp subiria ~16%).","mitigation":"Acompanhar publicação da REN no DOU. Preservar enquadramento de despachado pelo ONS no CRCAP."},{"severity":"Alto","category":"Competição com gerador host","description":"Conexão compartilhada exige negociação com gerador host. Disputa por bay e prioridade de despacho.","mitigation":"Term sheet pre-bid + opção alternativa standalone como Plano B."},{"severity":"Médio","category":"Risco cambial (CAPEX em USD)","description":"~60% do CAPEX é importado. R$ 0,10 de depreciação cambial = +R$ 5-7M no CAPEX.","mitigation":"Hedge NDF 6-12 meses + cláusula OEM de lock cambial + funding BNDES em BRL."}],"recommendation":{"action":"REVIEW DEDICADO","priority":"Reavaliar","pdisp_recomendado_brl_per_mw_yr":1121166.0,"pdisp_classificatorio_brl_per_mw_yr":1009049.4,"pdisp_teto_assumido_brl_per_mw_yr":1700000,"margem_vs_teto_pct":34.0,"beta_aplicado":0.9},"predicted_red_team":{"findings":[{"rule":"approved_with_high_curtailment_warning","severity":"warn","message":"Aprovado com margin_warning_high_curtailment=true (curtail P12M=71.9%) — MISCR EPE não internaliza margem de escoamento. Solicitar análise ONS DPL antes de bidar."}],"max_severity":"warn","count":1,"note":"Predicted findings — simula approved sem votos com params default. Atualizados na decisão real."}}