{"decision_id":"69a13b36-45e2-482b-8c29-ec83014fa855","barramento_codigo":"BA_LAPA_230KV","status":"pending_committee","submitted_at":"2026-05-17T00:55:17.357558+00:00","decided_at":null,"frozen":true,"memo_snapshot":{"capex":{"mw":150.0,"hours":4.0,"conn_low":8000000.0,"bop_total":85050000.0,"conn_base":11500000.0,"conn_high":15000000.0,"total_brl":636550000.0,"bess_total":540000000.0,"bess_per_mw":3600000.0,"all_in_brl_per_mw":4243666.666666667,"connection_scenario":"existing_se","all_in_brl_per_kwh_ac":1060.92},"pdisp":{"mw":150.0,"note":"Modelo Phase 8.e calibrado ao dossier BJL. Cost-recovery 10y CRCAP; depreciation × 34% IRPJ+CSLL shield. Bid margin 15% on top (execution risk + cushion).","rates":{"corporate_tax_rate":0.34,"rate_debt_bndes_real":0.06,"target_irr_equity_real":0.142,"rate_debt_debenture_real":0.085},"funding_mix":{"equity_pct":0.3,"debt_bndes_pct":0.4,"debt_debenture_pct":0.3,"blended_debt_rate_real":0.0707},"capex_per_mw":4243667.0,"bid_margin_pct":0.15,"contract_years":10,"useful_life_years":20,"breakdown_per_mw_yr":{"debt_service":424339.0,"operating_tust":113000.0,"operating_total":373000.0,"equity_pretax_dividend":335530.0,"operating_om_seguro_ga":147000.0,"tax_shield_depreciation":72142.0,"operating_augmentation_avg":93000.0,"operating_encargos_setoriais":20000.0},"pdisp_total_per_mw_yr":1132870.0,"pdisp_total_project_brl":169930473.0,"bid_margin_brl_per_mw_yr":169930.0,"pdisp_recommended_per_mw_yr":1302800.0,"pdisp_cost_recovery_per_mw_yr":1132870.0,"pdisp_recommended_project_brl":195420044.0},"risks":[{"category":"Margem de escoamento real","severity":"Crítico","mitigation":"Solicitar análise de margem via NT-ONS DPL específica antes de comprometer CAPEX.","description":"Curtailment de 34.6% indica congestão — NT EPE-086 alerta que MISCR não internaliza margem de escoamento."},{"category":"Tarifa dupla TUST/TUSD","severity":"Crítico","mitigation":"Modelar cenário dual. Lance que sobrevive a ambos. Contribuição via ABSAE.","description":"ANEEL pendente Dir. Willamy Frota abr/2026 (NTC 13/2025 + NT Conjunta 3/2026). Se mantida dupla incidência, Pdisp sobe ~16%."},{"category":"Risco cambial (CAPEX em USD)","severity":"Médio","mitigation":"Hedge NDF 6-12 meses + cláusula OEM de lock cambial + funding BNDES em BRL.","description":"~60% do CAPEX é importado. R$ 0,10 de depreciação cambial = +R$ 5-7M no CAPEX."}],"identity":{"host_type":"gerador","operators":["CHESF","TAESA"],"apolo_rank":29,"host_total_mw":214.0,"cluster_letter":"B","is_apolo_top30":true,"score_preliminar":5.5,"host_dominant_fonte":"UFV","compound_voltages_kv":[500.0,230.0]},"scorecard":[{"tier":"amber","label":"β / MISCR","score":38},{"tier":"green","label":"Conexão","score":90},{"tier":"blue","label":"Margem operacional","score":50},{"tier":"red","label":"TUST-G","score":20},{"tier":"green","label":"Compound multi-V","score":80},{"tier":"blue","label":"Score APOLO","score":55}],"barramento":{"lat":-13.3059,"lon":-43.3525,"nome":"Lapa","codigo":"BA_LAPA_230KV","estado_uf":"BA","tensao_kv":230.0},"connection":{"scenario":"existing_se"},"curtailment":{"pct_p12m":34.62,"plant_count":3,"total_gwh_p12m":10.24,"margin_warning_high":true},"sensitivity":{"sensitivities":[{"category":"destroyer","variable":"tarifa_dupla_vs_simples","delta_pct":19.4,"rationale":"ANEEL pendente Dir. Willamy Frota abr/2026","unit_change":"+TUST na carga","delta_brl_per_mw_yr":220000},{"category":"destroyer","variable":"se_greenfield_vs_existing","delta_pct":17.2,"rationale":"SE greenfield ao invés de SE existente","unit_change":"+R$ 41M","delta_brl_per_mw_yr":195000},{"category":"warning","variable":"capex_plus_10pct","delta_pct":10.0,"rationale":"Cotação OEM 10% acima do baseline","unit_change":"+10%","delta_brl_per_mw_yr":113287},{"category":"destroyer","variable":"beta_perdido","delta_pct":10.0,"rationale":"Perda de 10% bonificação classificatória","unit_change":"0.90 → 1.00","delta_brl_per_mw_yr":113286},{"category":"warning","variable":"wacc_plus_100bps","delta_pct":7.8,"rationale":"Target IRR equity real +1pp","unit_change":"+1 pp","delta_brl_per_mw_yr":88000}],"beta_multiplier":0.9,"baseline_pdisp_brl_per_mw_yr":1132870.0},"generated_at":"2026-05-17","tese_factors":["curtailment de 34.6% — sinal forte de P30 MISCR EPE; β = 0.90","SE existente com vão disponível, infraestrutura amortizada (CAPEX conexão R$ 11.5M)","opcionalidade dual-voltage (500 kV, 230 kV) → conexão no nível mais barato","hub de geração próximo (214 MW UFV agregado)","Top-30 APOLO rank #29 — score 5.5/10"],"host_distress":{"max_score":null,"parent_groups":null,"signal_present":false,"generator_count":0},"recommendation":{"action":"PROSSEGUIR COM CAVEATS","priority":"Prioridade B","beta_aplicado":0.9,"margem_vs_teto_pct":23.4,"pdisp_recomendado_brl_per_mw_yr":1302800.0,"pdisp_teto_assumido_brl_per_mw_yr":1700000,"pdisp_classificatorio_brl_per_mw_yr":1172520.0},"schema_version":"1.0","tariff_signals":{"beta_fonte":"estudo_lrcap_140p_apendice_B","beta_status":"eligible","beta_multiplier":0.9,"tusdg_brl_per_mwh":15.9,"tustg_brl_per_mwh":15.9}}}